Stucco costs in Illinois range from $7–$16 per square foot in 2026. Illinois's regional cost multiplier of 112% vs the national average reflects local labor market conditions and material availability.

Stucco cost by project size in Illinois

Project ScaleEstimated Cost (Illinois)
Small (residential)$14–$48
Medium (light commercial)$56–$240
Large (commercial / industrial)$175–$960
Key materials: scratch coat, brown coat, finish coat. Material costs are 35–55% of total project cost; the remainder is labor, equipment, overhead, and profit.

What affects stucco cost in Illinois?

Get your Illinois stucco estimate

Free Stucco Estimator — Illinois Rates AppliedGet a detailed stucco estimate in 60 seconds. All Illinois cost data pre-loaded.
Estimate free →

Getting accurate bids in Illinois

A quoted price only means something if you can compare it to others. Ask every contractor for an itemized breakdown — materials, labor, equipment, overhead, and permits listed separately — instead of one bundled number.

Frequently asked questions

How much does stucco cost in Illinois?

In Illinois, expect $7–$16 per square foot for standard work. Labor is the biggest variable — get 3 bids from licensed Illinois contractors to ensure competitive pricing.

Is Illinois expensive for stucco compared to other states?

Illinois's costs are below the national average. The national baseline is $6–$14 per square foot, and Illinois's multiplier pushes that to $7–$16.

What should be included in a Illinois contractor's estimate?

A complete estimate itemizes materials, labor, equipment and overhead, and permit fees separately rather than bundling them into one number. If a bid doesn't break these out, ask for a revised version before comparing it to other quotes.

How can I lower construction costs in Illinois?

The biggest levers are timing (avoiding peak-season demand), scope discipline (locking the design before bidding to avoid change orders), and getting enough competing bids to find the real market rate. Ximator's free estimate gives you that baseline before you talk to contractors.