ADU costs in Maryland range from $92000–$287500 per project in 2026. Maryland's regional cost multiplier of 115% vs the national average reflects local labor market conditions and material availability.

ADU cost by project size in Maryland

Project ScaleEstimated Cost (Maryland)
Small (residential)$184K–$863K
Medium (light commercial)$736K–$4313K
Large (commercial / industrial)$2300K–$17250K
Key materials: all trades combined. Material costs are 35–55% of total project cost; the remainder is labor, equipment, overhead, and profit.

What affects adu cost in Maryland?

Get your Maryland adu estimate

Free ADU Estimator — Maryland Rates AppliedGet a detailed adu estimate in 60 seconds. All Maryland cost data pre-loaded.
Estimate free →

Getting accurate bids in Maryland

A quoted price only means something if you can compare it to others. Ask every contractor for an itemized breakdown — materials, labor, equipment, overhead, and permits listed separately — instead of one bundled number.

Frequently asked questions

How much does adu cost in Maryland?

In Maryland, expect $92000–$287500 per project for standard work. Labor is the biggest variable — get 3 bids from licensed Maryland contractors to ensure competitive pricing.

Is Maryland expensive for adu compared to other states?

Maryland's costs are below the national average. The national baseline is $80000–$250000 per project, and Maryland's multiplier pushes that to $92000–$287500.

What should be included in a Maryland contractor's estimate?

A complete estimate itemizes materials, labor, equipment and overhead, and permit fees separately rather than bundling them into one number. If a bid doesn't break these out, ask for a revised version before comparing it to other quotes.

How can I lower construction costs in Maryland?

The biggest levers are timing (avoiding peak-season demand), scope discipline (locking the design before bidding to avoid change orders), and getting enough competing bids to find the real market rate. Ximator's free estimate gives you that baseline before you talk to contractors.